New distribution depot for TNT

2nd May 2017

May 2017, Location: Birmingham.

Installed 850 metres of handrail, 11,000m² of safety nets, 13.5 metre high tower.

Client:  Rooksby Roofing. Main contractor: Berriman. New distribution depot for TNT.

Back to news